Aangan Operations

Site visits

0 upcoming · 4 awaiting a write-up

Upcoming

0

Booked and confirmed

Needs an outcome

4

Visited, nothing written up

Reschedule requested

0

Client asked for a new slot

Write up what these visits established (4)

Optional, but it is what keeps three quotes comparable
  • Rawat ModularFurniture WorkLD-1042
    27 Aug 2026 · Lucknow
  • Jyoti Paints & WaterproofingPaintingLD-1042
    27 Aug 2026 · Lucknow
  • Qureshi Design BuildFurniture WorkLD-1042
    1 Sept 2026 · Lucknow
  • Singh Steel & FabricationPaintingLD-1042
    2 Sept 2026 · Lucknow

No upcoming visits. Book them from a lead once vendors are assigned.

Past visits (8)

  • Singh Steel & FabricationPaintingLD-1042

    No outcome recorded

    Scheduled

    2 Sept 2026

  • Qureshi Design BuildFurniture WorkLD-1042

    Client available after 6 pm only.

    Confirmed

    1 Sept 2026

  • Jyoti Paints & WaterproofingPaintingLD-1042

    No outcome recorded

    Completed

    27 Aug 2026

  • Rawat ModularFurniture WorkLD-1042

    No outcome recorded

    Completed

    27 Aug 2026

  • Colour Craft Painting Co.PaintingLD-1042

    Damp on the two kitchen-side walls is coming from the neighbouring bathroom wall, not from outside — the patch is at skirting height and dry above 3 ft. Needs treatment before painting or it will surface again. Painted area measures 3,180 sq.ft including ceilings. All three painters asked to price the damp treatment as a separate line so the base figure stays comparable.

    Scope changedCompleted

    26 Aug 2026

  • Yadav Furniture WorksFurniture WorkLD-1042

    Wall is 7 ft 2 in, not the 7 ft the customer estimated, and the ceiling is 10 ft 1 in — so the loft is a full 2 ft 6 in, taller than assumed. Her existing ply covers the carcass but not the loft shutters. Skirting runs behind the wardrobe line and will need cutting. All three vendors have been told to quote on 7 ft 2 in with the loft included.

    Scope changedCompleted

    26 Aug 2026

  • Sri Balaji FabricatorsFabricationLD-1031

    46 running ft measured across three balconies including the returns, against the 40 ft the customer estimated. Parapet is 3 in out of level along the longest run, so the railing needs packing at the base — priced in. Glass infill confirmed over baluster.

    Scope changedCompleted

    16 Jul 2026

  • Studio Aarohi InteriorsInterior DesignLD-1017

    Carpet area confirmed at 1,520 sq.ft. Kitchen plumbing is where the customer said, so no shifting. Master wardrobe wall is 9 ft 4 in. Client settled on matte throughout and ruled out gloss entirely. No change to scope.

    Completed

    4 Jun 2026